Hoover Ave, Mesa AZ street index
1-42 Hoover Ave, Mesa AZ
Market Activities
Nov 2022 - present
Listed for sale
Jun 2022 - present
Listed for sale
Feb 2022 - present
Listed for sale
Aug 2021 - present
Listed for sale
Mar 2021 - present
Listed for sale
May 2019 - present
Listed for rent
Oct 2016 - present
Listed for rent
Mar 2024 - Mar 2024
Sold
Nov 2018 - Feb 2024
Sold
Apr 2018 - Feb 2024
Sold
Sep 2023 - Oct 2023
Recent Rent
Sep 2022 - Nov 2022
Recent Rent
Jun 2022 - Jul 2022
Recent Rent
Apr 2021 - Jul 2022
Recent Rent
Aug 2021 - Feb 2022
Sold
Dec 2018 - May 2019
Sold
Nov 2018 - May 2019
Sold
Apr 2016 - Oct 2017
Sold
Dec 2016 - Jan 2017
Recent Rent
5836 Hoover Ave
- 1522 sqft
- 3 beds
- 2.5 baths
Immaculate 3 bedroom located in sought after Summerlin Village in the heart of Mesa. The house is...
Building Permits
Dec 18, 2015
100 Hoover Ave
- Contractor: Redline Electric & Solar Llc
- Valuation: $900,000
- Fee: $289.81 paid to City of Glendale, Arizona
- Permit #: 92735
Apr 5, 2011
40 Hoover Ave
Description: Install one set of non-illuminated foam letters to west elevation of building. "afp aire filter products" 60 sf. 1 sign id #29924
- Contractor: Comet Signs And Lighting
- Fee: $182.78 paid to City of Mesa, Arizona
- Client: 40 Whoover Llc
- Parcel #: 13947057
- Permit #: BLD2011-01008
Apr 22, 2010
150 Hoover Ave
Description: Gas service and meter install at 150 w hoover ave. the cost to install the natural gas facilities for the above project is $7,244.00. the city of mesa gas division or a contractor employed by the city will furnish labor and materials to install the new gas service, meter and all associated appurtenances. prior to the new install, the total amount of $7,244.00 must be paid at the building safety dept located at 55 n center st. any questions, please call scot sherwood at 480-644-2509. senior gas engineer.
- Fee: $7,244.00 paid to City of Mesa, Arizona
- Client: 526 E Juanita Llc/Lcl Properties Ll
- Parcel #: 13947053
- Permit #: BLD2010-01803
Jan 6, 2010
106 Hoover Ave
Description: Convert existing carport to garage. wood framed, siding. approved as noted: 1) provide minimum 1 3/8" solid core or 20-min fire rated door; 2) provide minimum 1/2" gyp board applied to garage side of walls adjacent to livable areas; 3) provide minimum 10' setback measured from property line to face of garage.
- Fee: $280.80 paid to City of Mesa, Arizona
- Client: Nguyen Anh
- Parcel #: 13958023
- Permit #: BLD2009-05672
Jun 10, 2008
50 Hoover Ave
Description: Installing one attached illuminated cabinet display to the front fascia of the suite, one sign id tag 26605
- Contractor: Skyline Signs Inc
- Fee: $252.80 paid to City of Mesa, Arizona
- Client: Payote Llc
- Parcel #: 13947056
- Permit #: BLD2008-05456
Apr 9, 2008
147 Hoover Ave
Description: Demo an existing front porch and add a new one wood construction asphalt roof
- Fee: $250.00 paid to City of Mesa, Arizona
- Client: Ruiz Jose Luis
- Parcel #: 13958015
- Permit #: BLD2008-03788
Jan 25, 2008
215 Hoover Ave
Description: Demolition of existing 400 sf pool, all utilities to be removed prior to inspection.
- Fee: $100.00 paid to City of Mesa, Arizona
- Client: Chinchillas Vega Jesus L Etal
- Parcel #: 13958009
- Permit #: BLD2008-00785
Oct 12, 2007
1042 Hoover Ave
Description: Patio addition to rear of home. wood framed construction with polyurethane foam w/2 coats of elastomeric sealer roof. icc # er-5979
- Fee: $330.00 paid to City of Mesa, Arizona
- Client: Reith John David
- Parcel #: 13914198
- Permit #: BLD2007-10359
Sep 20, 2006
5850 Hoover Ave
Description: Master plan--kb plan #1521 2 story wood construction trusses tile roof stone and stucco finish post tension slab and gas system. total gas demand 290 cfh gas meter= class 250 gp-12
- Contractor: Kb Home
- Fee: $6,409.00 paid to City of Mesa, Arizona
- Client: Bowden William C/Kelli J
- Parcel #: 14153755
- Permit #: BLD2006-08257
May 3, 2006
5828 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,439.00 paid to City of Mesa, Arizona
- Client: G7 Llc
- Parcel #: 14153840
- Permit #: BLD2006-04372
Apr 3, 2006
5866 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,421.00 paid to City of Mesa, Arizona
- Client: Lamb Ashley M
- Parcel #: 14153759
- Permit #: BLD2006-02987
Apr 3, 2006
5854 Hoover Ave
Description: Master plan-kb home #1817 for summerlin village. 2 story wood construction tile roof stone and stucco finish with post tensioned slab.
- Contractor: Kb Home
- Fee: $6,517.00 paid to City of Mesa, Arizona
- Client: Teisl Bridget
- Parcel #: 14153756
- Permit #: BLD2006-02992
Apr 3, 2006
5858 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,421.00 paid to City of Mesa, Arizona
- Client: Gurrola Melissa D/Canas Jose R/Irma
- Parcel #: 14153757
- Permit #: BLD2006-02990
Apr 3, 2006
5862 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,421.00 paid to City of Mesa, Arizona
- Client: Lepley Bradley S/Sabreena K
- Parcel #: 14153758
- Permit #: BLD2006-02988
Mar 16, 2006
5824 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,445.00 paid to City of Mesa, Arizona
- Client: Richins Jeffrey Scott
- Parcel #: 14153841
- Permit #: BLD2006-02479
Mar 9, 2006
5832 Hoover Ave
Description: Master plan--kb plan #1521 2 story wood construction trusses tile roof stone and stucco finish post tension slab and gas system. total gas demand 290 cfh gas meter= class 250 gp-12
- Contractor: Kb Home
- Fee: $6,325.00 paid to City of Mesa, Arizona
- Client: Federal National Mortgage Associati
- Parcel #: 14153839
- Permit #: BLD2006-02219
Mar 9, 2006
5844 Hoover Ave
Description: Master plan-kb home #1661 for summerlin village 2 story wood construction trusses tile roof stucco and stone finish post tension slab gas system.total gas demand 290 cfh gas meter = class 250 gp-12
- Contractor: Kb Home
- Fee: $6,409.00 paid to City of Mesa, Arizona
- Client: Butler Andrea Jean
- Parcel #: 14153836
- Permit #: BLD2006-02216
Mar 9, 2006
5840 Hoover Ave
Description: Master plan--kb plan #1521 2 story wood construction trusses tile roof stone and stucco finish post tension slab and gas system. total gas demand 290 cfh gas meter= class 250 gp-12
- Contractor: Kb Home
- Fee: $6,325.00 paid to City of Mesa, Arizona
- Client: Call Austin D/Brittany S
- Parcel #: 14153837
- Permit #: BLD2006-02221
Mar 9, 2006
5836 Hoover Ave
Description: Master plan--kb plan #1521 2 story wood construction trusses tile roof stone and stucco finish post tension slab and gas system. total gas demand 290 cfh gas meter= class 250 gp-12
- Contractor: Kb Home
- Fee: $6,331.00 paid to City of Mesa, Arizona
- Client: Guerra Eraclina
- Parcel #: 14153838
- Permit #: BLD2006-02220
Fire Incident History
10 Jan 2016
Passenger vehicle fire
Property Use:
Residential street, road or residential driveway
Incidents registered in Federal Emergency Management Agency
28 Sep 2015
Building fires
28 Sep 2015
Overheated motor
Property Use:
Household goods, sales, repairs
30 May 2010
Building fires
Residents
Who has lived here
| Resident | Phone Number | ||
|---|---|---|---|
| Dar*** | 602-***-**** |
- 3 beds
- 2 baths
- Lot: 7,619 sqft
- Built in 1974
Facts
Lot size: 7,619 sqft
Rooms: 5
Stories: 1
Exterior walls: Block
Air conditioning: Refrigeration
Parking: Carport
Who has lived here
- 2 baths
- Lot: 7,771 sqft
- Built in 1975
Facts
Lot size: 7,771 sqft
Rooms: 6
Stories: 1
Exterior walls: Block
Air conditioning: Refrigeration
Parking: Garage
Who has lived here
Who has lived here
- 2 baths
- Lot: 6,581 sqft
- Built in 1975
Facts
Lot size: 6,581 sqft
Rooms: 5
Stories: 1
Exterior walls: Brick
Air conditioning: Refrigeration
Parking: Garage
Who has lived here
Who has lived here
- 2 baths
- Lot: 7,019 sqft
- Built in 1976
Facts
Lot size: 7,019 sqft
Rooms: 5
Stories: 1
Exterior walls: Block
Air conditioning: Refrigeration
Parking: Carport
Who has lived here
| Resident | Phone Number | Additional info | |
|---|---|---|---|
| Edd*** | Type: Homeowner Job: Professional/Technical School/College: Associate degree or higher | ||
| M C*** | 480-***-**** | ||
| Bea*** | 480-***-**** | Type: Homeowner Job: Executive, Administrative, and Managerial Occupations School/College: High school graduate or higher Email: | |
| Cha*** | 480-***-**** | Type: Homeowner Job: Executive, Administrative, and Managerial Occupations School/College: High school graduate or higher | |
| Les*** | 480-***-**** |
Who has lived here
| Resident | Phone Number | Additional info | |
|---|---|---|---|
| Air Cold Supply | 480-***-**** | Categories: Air Conditioning Contractors Industry: Heating & Air Conditioning/hvac | |
| FERGUSON-AIR COLD SUPPLY | 480-***-**** | Industry: Heating & Air Conditioning/hvac | |
| Ferguson Heating & Cooling | 480-***-**** | Industry: Plumbing Equip Merchant Whols SIC: 5074 - Plumbing and Heating Equipment and Supplies (Hydronics) Site: ferguson.com | |
| Rio*** | 480-***-**** | Email: Organization: Ferguson Heating & Cooling Title: Manager Industry: Plumbing Equip Merchant Whols Site: ferguson.com Specialties: Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers; Plumbing and Heating Equipment and Supplies (Hydronics) | |
| Air Filter Products | Industry: Mfg General Industrial Machinery |

